en English
en Englishes Spanishpt Portuguesear Arabicht Haitian Creolezh-TW Chinese (Traditional)

Advocate

Your Local Online News Source for Over 3 Decades

PUBLIC HEARING FOR PETITION FROM BOSTON GAS COMPANY D/B/A NATIONAL GRID, WALTHAM, MASSACHUSETTS

To all parties interested in the public hearing.
Be it hereby ordered:

Boston Gas Company d/b/a National Grid, Waltham, Massachusetts hereby respectfully requests consent to the locations of mains as hereinafter described for the transmission and distribution of gas in and under the following public streets, lanes, highways and places of the City of Everett and of the pipes, valves, governors, manholes and other structures, fixtures and appurtenances designed or intended to protect or operate said mains and accomplish the objects of said Company; and the digging up and opening the ground to lay or place same

The following are the streets and highways referred to:

Work Order # 1542549 Boston St to Revere Beach Parkway – National Grid – To install approximately 400 feet of 8-inch, plastic gas main Boston Street between Revere Beach Parkway and Vale Street in accordance with the attached plans.

Wherefore it prays that after due notice and hearing as provided by law, it be granted permission to excavate the public highways and to run and maintain underground gas main and conduits, together with such sustaining and protecting fixtures as it may find necessary for the transmission of gas, said underground conduits to be located substantially in accordance with the plan filed herewith marked: Boston Street to Revere Beach Parkway – Everett – Massachusetts.

Hearing to be held with the Everett City Council, held on Monday at 7:00PM, on the 13th of November, 2023 at the Everett City Council Chambers, 3rd Floor, Everett City Hall.

November 03, 2023

Contact Advocate Newspapers