To all parties interested in the public hearing.
Be it hereby ordered:
Massachusetts Electric Company d/b/a National Grid of North Andover, Massachusetts, that it desires to construct a line of underground electric conduits, including the necessary sustaining and protecting fixtures, under and across the public way or ways hereinafter named.
The following are the streets and highways referred to:
Plan # 30811248 Locust St – National Grid is petitioning to open the street in front of 339 Main Street to install (2) – 4” underground conduits located on the sidewalk for a new electric service to be located at 345 Main Street.
Wherefore it prays that after due notice and hearing as provided by law, it be granted permission to excavate the public highways and to run and maintain underground electric conduits, together with such sustaining and protecting fixtures as it may find necessary for the transmission of electricity, said underground conduits to be located substantially in accordance with the plan filed herewith marked: Locust Street – Everett – Massachusetts.
Hearing to be held with the Everett City Council, held on Monday at 7:00PM, on the 13th of November, 2023 at the Everett City Council Chambers, 3rd Floor, Everett City Hall.
November 03, 2023